0 Comentarios
Finally, we managed to get SAWFACE back in the 2019. It has not been easy but it will be under operation during the growing period from March to September 2019. The target CO2 concentration will again be 550 ppm. Now we are with the preparations of the facility so that everything works correctly in March. All this would not have been possible without the tremendous interest of Carlos Ruíz de La Hermosa, director of Las Tablas National Park: thank you very much Carlos. If you are interested in conducting a study on this infrastructure, it is time to contact us ([email protected]). |
ArchivosCategorías |